IMPORTANT!
Read all instructions carefully and completely to ensure proper installation.
WARNING!
Parts have sharp points & edges. Use extreme caution when handling & installing. Wear safety glasses at all times.
Download Instructions for Printing
Download these instructions for printing - PDF
Required Tools and Supplies
Terms to Know
-
Connector Clip
-
Start/Stop Clip
-
Screw
STEP 1
Starting the First Board
Install screw straight down through start/stop clip and into ledger board. Screw should be in line with center of joist. It is important that this board is straight
and well secured.
click to enlarge
STEP 2
Position Fasteners
Fully insert connector clip into grooved edge of deck board. Screw hole should be in line with the center of joist.
click to enlarge
STEP 3
Install First Fastener
While standing on deck board, install provided screw at 45° angle through fastener and into joist, while applying pressure on fastener. Install one fastener
and screw at each support joist.
Make sure fastener body is vertical to deck board and the screw is holding fastener down tight to deck board.
click to enlarge
STEP 4
Completing Installation of Boards
- Place next deck board into position. Holding the deck board 2" back from fastener, push deck board with enough force to lock into place.
- Check gap between boards for consistency. Apply force to ensure board is fully installed engaging boards with 1/4" bump-stop tab.
Trex HideawayTM
fasteners will provide proper 1/4" gapping when installed correctly.
click to enlarge
STEP 5A
Installing the Last Board using Fascia Board (Option 1)
To finish, install start/stop clip and install screw at a 45° through clip tab and into joist. Install a vertical fascia ush with deck board surface.
click to enlarge
STEP 5B
Installing the Last Board using with Overhang (Option 2)
Prior to installing last board, predrill a pilot hole at a 45° through rim joist. Once hole is drilled, put last board in place and install a 2 1/2" decking
screw into predrilled pilot hole.
click to enlarge